We haven't had a lot of progress this week...we've been waiting on our roof trusses. We are optimistic that our house will still be finished by the middle of November...hopefully in about 6 weeks. Here are some pictures of the framing.
This is our front porch (on the left), with Hannah's room next to that and Spencer's room on the far right. Hannah loves to show everyone "her window."
Yes! We will not only have a 3 car garage, but I hope to be able to use it.
This is a picture of our family room, from our kitchen. It's not much to look at right now...but that corner will have a fireplace some day!
This week, we hope to have our trusses installed, the bonus room framed, and get a start on our HVAC, plumbing and electrical. If all goes right, by next week we'll be insulating and drywalling. Look for those pictures!!!!!!